Home >> Selected Projects >> Tunnels, Ben-Gurion International Airport and Modi’in Railway Track

Tunnels, Ben-Gurion International Airport and Modi’in Railway Track

The Company executed the forepoling method, rock anchors, soil anchors, rock bolts and shotcrete in the Shapirim, Modi’in and Anabeh tunnels.

 


  • Shapirim Tunnel – Forepoling in clay soil
    Shapirim Tunnel – Forepoling in clay soil
  • Shapirim Tunnel-picture 2
    Shapirim Tunnel-picture 2
  • Modi’n Tunnel – Forepoling in fissured limestone
    Modi’n Tunnel – Forepoling in fissured limestone
  • Anabeh Tunnel – Forepoling in marl soiI
    Anabeh Tunnel – Forepoling in marl soiI
  • Anabeh Tunnel-picture 2
    Anabeh Tunnel-picture 2
  • Anabeh Tunnel-picture 3
    Anabeh Tunnel-picture 3
  • Tunnel 12 Modi’in -Installing steel meshes and shotcreting onto piles
    Tunnel 12 Modi’in -Installing steel meshes and shotcreting onto piles