Anchors



TAGS_PAGE_TITLE

Anchors

Drill Hollow Bar System

DYWI® Drill Hollow Bar System- Advantages and Characteristics The main advantages of the DYWI® Drill Hollow Bar are: *Fast drilling and placing due to drilling, anchor installation a ...   read more

Rock Bolts

DYWIDAG Rock Bolts- Advantages and Characteristics *high loads with small borehole diameters. *continuous bar thread allows cutting at any point, length adaptation on site, easy to orde ...   read more

Tensioning Equipment

Lipsker supplies DSI tensioning systems – the best in the world for post tensioning and for tensioning bar and cable soil anchors. This is the lightest mobile anchor tensioning equipment o ...   read more

Geotechnical Instrumenation

SAM Permanent anchors (and temporary anchors when required), can be fitted with an integral anchor head, containing an SAM ׁ)Download- (להוסיף type system for the constant measurement ...   read more

Strand Anchors

DYWIDAG Strand Anchors System - Advantages and Characteristics *Large transport lengths avoid splices. *Need little space during transport, storage and installation. *Sturdiness against damage e ...   read more

Polimer Anchors

Anchor Manufacturing Plant Lipsker’s customer service system for the field of geotechnics includes a computerized, automated plant for the manufacture of temporary and permanent ...   read more

News 1

Lipsker & co. is now executing a permanent anchoring project, for the Ma'agan Company in Haifa Port. The work includes the installation of Dywidag Anchors through a Sheet Pile Wall. ...   read more

Kishon Port, Haifa

Lipsker. installed permanent, 25-meter deep anchors at Kishon Port to reinforce the pier. This was executed by means of a drilling machine manufactured at the Lipsker plant that was specially adap ...   read more

The Bahai World Center, Haifa

Twelve rows of permanent anchors with double anti-corrosion protection. 50 mm diameter DYWIDAG steel rods. 7” drilling diameter, a state-of-the-art monitoring and measuring system: Thre ...   read more

Renovation of the Haifa Carmelit Subway

Prior to the Haifa Carmelit resuming operation, Lipsker. carried out all the geotechical works connected with the tunnel’s restoration: Core sample drilling for the geological surv ...   read more

New Capernaum Church

The church is built on eight columns joined to four foundations. On each of these foundations Lipsker installed 24 permanent, vertical duplex anchors at a depth of 16 meters, with expanded pressur ...   read more

The New Tel Aviv Central Bus Station

Test borings, load tests, temporary and permanent anchors. An anchored element wall cast on site, the first of its kind in Israel.     read more

Background

The Lipsker Company was founded in 1962 in Tel Aviv by Yitzchak Lipsker after he had worked for 10 years at TAHAL – the Israel Water Resources Development Company. In the mid 1980’s, his son Yor ...   read more